Korail Tests AI and Autonomous Drone Inspections on a 5 km Section Between Osong and Daejeon
By the end of 2026, Korail will conduct a demonstration of railway facility inspections using autonomous drones and AI on an approximately 5 km section of high-speed rail between Osong and Daejeon. Reducing workers’ exposure to risk is presented as an expected benefit. Korail plans to expand the sections covered in stages after verifying analytical accuracy and flight stability.