Using satellite imagery and other sources, researchers identified 403 hyperscale data centers operating across the United States from May 2024 through April 2025 and estimated their electricity use. Applying operating scenarios for each facility, they estimated annual consumption at 68–99 terawatt-hours (TWh).[1]

The estimated range represents 1.5–2.2% of total U.S. electricity consumption. Under the middle scenario, consumption was 82 TWh, or 1.8% of the U.S. total. The range and midpoint vary according to the operating scenarios for each facility.[1]

The researchers also analyzed the generation mix supplying each facility, based on information about the power grid. They estimated that fossil fuels accounted for 53.9% of supplied electricity, nuclear power for 20.9%, and renewables for 25.3%. Based on this mix and electricity use, they estimated annual carbon dioxide emissions from the electricity consumption of the 403 facilities at 21 million–31 million tons, with a midpoint of 25.7 million tons.[1]

The paper’s lead author said that demand for AI computing continues to grow and that the electricity use and carbon footprint reported in the study may already have become substantially larger by 2026. This is a point where the study-period estimates should be distinguished from the lead author’s outlook on subsequent conditions.[1]