Nowon District announced on November 20, 2026, that it would carry out winter snow-clearing measures. The measures will remain in effect through March 15, 2027, with the goal of clearing key routes within 1 hour when snow falls. The district plans to deploy its own and privately contracted snow-removal vehicles on major roads and side streets.[1]

A private resident snow-clearing response team made up of 962 people will handle alleys and sidewalks that are difficult for vehicles to access. The district will provide them with 52 additional dedicated snow-removal bins and 52 snow-melting agent carts, bringing the totals to 127 bins and 177 carts, respectively. It also said it had secured 176 pieces of snow-clearing equipment and 2,260 tons of snow-melting agent.[1]

The district has designated 22 locations with heavy pedestrian traffic or a high risk of ice, including aging apartment complexes, school routes, child protection zones, and bus stops, as priority management areas and will assign dedicated staff there. It plans to station seven sidewalk snow-clearing machines along approximately 7.7 km of Dongil-ro to ensure pedestrian safety during commuting hours.[1]

Road heating cables have been additionally installed at two locations, including near Buramsan Park and Gwangwoon University Station Prahills, expanding the number of areas in operation to 20. Automatic brine sprayers will operate at three locations.[1]